EIRE Constructions – Avoca Beach

In conjunction with Central Coast Council, Superior HDD was engaged on behalf of EIRE Constructions to install a new DN560 watermain under Avoca lagoon.

Hisway – Bomaderry

The Moss Vale Road Urban Release project is currently under construction through Shoalhaven Water. This project was constructed to supply adequate future surfacing to the urban release area.

Seymour Whyte – Mulgoa Road Upgrade

The Mulgoa Road Upgrade project consists of large works to widen the Mulgoa Road corridor to a six-lane thoroughfare and providing improved access to the M4 motorway.

Diona – Cameron Park Reservoir

It was decided that HDD was the most effective way to get from the newly proposed reservoir in Cameron Park to the existing Hunter Water site and connection point.